Blog
The reasoning behind the rows
Each post takes one question the index raises and answers it with public data, the working shown and the sources listed. Written to be read by people, and to be cited by the machines that now answer people's questions.
Feed RSS · Editor Prem Naraindas · Licence CC BY 4.0
Posts
Published
Is the B200 more energy-efficient than the H100?
Yes on all 14 models measured on both cards: the H100 row uses 1.05× to 4.55× the B200 row's energy per token, median 1.63×. How much is the silicon.
How much energy does an AI query use?
One answer from a busy 32B model costs about 0.040 Wh of GPU energy; Google says 0.24 Wh per median prompt. Both are right. Here is why.
What is watt-hours per million tokens, and why not joules per token?
The unit behind the index: what Wh/M counts, what it leaves out, how it converts to kWh, carbon and the meter, and why joules per token became watt-hours.
Why an idle GPU wastes energy: the concurrency ladder
Same model, same two H100 cards: 7.1× in GPU energy per token between a running batch of 8 and 256. Why the under-used card is the expensive one.
What a million tokens costs in watt-hours
What the public measurements say a million output tokens takes in GPU watt-hours, and why a busy server uses a fraction of the energy of a quiet one.
Upcoming
The next five
- nextThe sliced GPU. Energy per token when one card is split into MIG instances, measured: Qwen 3 14B on two 3g.40gb slices against the whole card, both in BF16; then Qwen 3 32B, whole card in BF16 against two FP8 or INT4 slices.
- thenThe idle token. Why an under-used GPU spends more energy on every token than a busy one, with the concurrency ladder as the evidence.
- thenPer correct answer, not per token. Small model against large model once re-tries and wrong answers are counted.
- thenWhere the electricity is. The same workload in Riyadh, Belgrade, Hong Kong and Auckland, by grid intensity.
- thenWhat the EU AI Act asks, and what it does not. The training-energy item on model providers, the open-source exemption and the 2027 date, and why none of it reaches a buyer.
Order and timing may change; a post ships when its data does. Volunteers who want to take one of these: see Contribute.
Cite this page: Lead Green, a Katonic project. Blog: GPU energy per token, explained with sources. https://leadgreen.ai/blog/, release 2026-10-19, retrieved [date]. CC BY 4.0.